All cases

Prioritize review of two facilities

Expected credit loss · Fictional case

The situation

A has exposure ₹50 crore, PD 2% and LGD 40%. B has exposure ₹20 crore, PD 4% and LGD 60%. Use a simplified single-period calculation.

Your task

Which facility has higher modeled expected loss?

Reveal step-by-step solution
  1. Set up the problem

    A expected loss = ₹50 × 0.02 × 0.40 = ₹0.40 crore.

  2. Work through the numbers

    B expected loss = ₹20 × 0.04 × 0.60 = ₹0.48 crore.

  3. Interpret the result

    B has ₹0.08 crore more expected loss despite the smaller exposure. A full allowance may require multiple scenarios and discounting.

What to remember

Align PD horizon and exposure at default. Include recovery assumptions in LGD.

Review the topic cheat sheet